7 Things to Remember When Choosing a Big 5 Global 2026 Exhibition Stand
This guide covers 7 decisions to settle before approving your stand, using the organizer's 2025 audience data and DWTC's published build rules. For the wider picture, see our exhibition stand design and build services.

Table of Contents
Introduction
Big 5 Global opens at Dubai World Trade Centre (DWTC) on November 23, 2026, nine weeks from the date of this update. The 2025 edition recorded 85,093 attendees and 2,866 exhibitors, so your stand will compete for attention across a busy show floor.
Choosing a stand is more than a design decision. Your position, format, size, and builder affect what you can build, which approvals you need, and how well the space works during the show.
Key Takeaways
- Build for buyers. In 2025, 70% of visitors came from the GCC, while 43% were chairmen, board members, partners, owners, or C-level executives.
- Choose the format carefully. Space only, multi block, double deck, triple deck, and country pavilion structures require DWTC review and a Permit to Build before construction starts.
- Work within fixed limits. DWTC sets minimum aisle widths, rear clearance, roof clearance, and height limits that affect your design from the start.
- Check your plot before designing. Confirm the stand number, dimensions, open sides, neighboring stands, and latest exhibitor rules before approving a concept.
1. Start With Who Actually Walks the Floor
Your stand needs to work for the people who actually attend the show. The organizer's 2025 report shows that 70% of visitors came from the GCC, 11% from Asia and Oceania, and 7% from Europe.
The audience was also senior. Chairmen, board members, partners, owners, and C level executives made up 43% of visitors. Another 34% were senior management.
That audience changes how you should use the floor. A large product display with nowhere to sit wastes valuable space. Give serious buyers somewhere to talk, then make your main product message easy to understand from the aisle.
With visitors from 169 countries in 2025, keep the message simple. Someone walking past should understand what you sell within a few seconds.
Do this: Write 1 sentence describing your ideal visitor and 1 sentence describing what that visitor should be able to do at your stand within 2 minutes. Give both to your designer before concept work starts.
2. Pick the Stand Type by the Approvals It Triggers
The stand format affects the approval process before construction even begins. DWTC's handbook requires its structural engineer to evaluate exhibition structures.
The handbook lists space only, multi block space only, double deck, triple deck, country pavilion, and temporary meeting room structures among the stand types that require submission. Submissions go through the Organiser+ portal.
You also need a Permit to Build (PTB) before construction starts. DWTC states that it may take disciplinary action when exhibitors build without the required permit.
The handbook's fee table also separates stand types. A bespoke ground floor stand on a space only plot, or a system stand taller than 3 m, falls under the space only submission category. The listed fee is AED 500. Multi block, double deck, and triple deck stands are listed at AED 1,000 each, while a system stand below 3 m is listed with no submission fee.
These fees come from the June 2024 handbook and may have changed. Confirm the current charges with the organizer before budgeting.
We could not find public details for Big 5 Global's current stand packages, so do not assume what your package covers. A modular or pop up build can reduce on site construction work, while a custom stand gives you more control over product areas, meeting rooms, and branding.
Do this: Ask dmg events which stand formats are available in your hall and exactly what your package includes.
3. Read the Floor Plan for Open Sides and Neighbors
Your position affects how visitors reach the stand. Open sides are the edges of your plot that face an aisle.
A corner plot normally has 2 open sides. A peninsula has 3. An island has 4. More open sides give visitors more routes into the stand, but they also reduce the wall space available for graphics, storage, and screens.
Big 5 Global 2026 spans Exhibition Plaza, Halls 1 to 8, the Sheikh Maktoum, Sheikh Rashid, and Sheikh Saeed halls, Za'abeel Halls 1 to 3, and the Trade Centre Arena.
Your neighbors matter as well. The 2025 show featured live machinery demonstrations from BAUER, SANY, and Würth in the Outdoor Plaza. Digital Construction World and Start up City also brought together 120 technology exhibitors.
The 2026 event includes several co located events, including Heavy, Totally Concrete, HVACR World, and Future FM. Your location can therefore affect the type of traffic passing your stand.
What the 2025 Exhibitor Mix Shows
Asia and Oceania accounted for 39% of exhibitors in 2025. Europe represented 34%, while UAE exhibitors represented 18% and GCC exhibitors represented 5%.
The visitor mix looked different. GCC visitors accounted for 70% of attendance.
The report's regional definitions and footnotes do not give enough detail to treat these figures as a direct market comparison. Still, the difference is useful when planning your message. Many exhibitors are selling into markets outside their home region, so local references, regional projects, and clear support information can matter.
Do this: Confirm your hall, stand number, dimensions, and open sides in the organizer's exhibitor portal before briefing your designer. The concept needs to match the plot you actually hold.
4. Size the Space to the Job It Has to Do
Buy enough floor space for the work your team needs to do. Do not start with a large stand and then try to fill it.
List every function first. Include product displays, demonstrations, meetings, reception, storage, staff space, and visitor circulation. Give each function a practical footprint.
If everything does not fit, remove a function. Do not squeeze every feature into the stand and leave visitors with no room to move.
DWTC's rules also affect your calculations.
- Storage: Do not store boxes or materials behind the stand. Put a proper storage area inside your allocated footprint.
- Display: Aisles are not part of your display area. Keep tables, chairs, products, and other elements inside your stand boundary.
- Access: Stands that are 3 m or more in depth or width must provide wheelchair access. The handbook normally requires a ramp 1,000 mm wide with a maximum slope of 1:12. The ramp cannot extend into the aisle.
Enclosed meeting rooms have additional requirements. Fire safety measures and illuminated exit signs apply, while rooms for 50 or more people require more than 1 exit.
If you want a private meeting room, tell your builder at the beginning. Adding one after the layout is approved often creates a space problem.
Do this: Sketch every activity with its required floor area. Add storage and the access ramp where required, then choose the stand size.
5. Design Inside DWTC's Hard Limits
Some stand ideas look good in a render but will not work on the actual DWTC floor. Check the venue rules before approving the design.
Key DWTC Design Limits
- Aisles: DWTC requires aisles to be at least 2.5 m wide. The handbook recommends 3 m for the main central aisle.
- Rear clearance: Keep a 1 m clear gap behind stands where required. Do not use this area for storage or structures.
- Roof clearance: Keep 1.5 m between stand roofs and ceiling drop points.
- Rigging: Do not hang structures from the venue roof. Approved lighting, AV trusses, and lightweight banners require the relevant approval and rigging process.
- Platforms: Raised platforms above 300 mm require structural details and calculations.
- Double deck stands: These require additional safety measures, including maximum occupancy signage. Spiral staircases are not permitted, and sprinkler requirements apply when the design has a ceiling.
- Concourse stands: Stands in the concourse are limited to 4 m in height. Double deck structures are not permitted there, and the stands are prefabricated off site.
These limits affect your layout before you choose finishes, graphics, or furniture.
Start with the product or service that matters most. Put it where visitors can see it quickly. Then place screens, meeting areas, storage, and reception around that core function.
Do this: Check the complete concept against every relevant DWTC limit before approving the final render.
6. Pick a Builder Who Can Get Your Permit to Build in Time
A good-looking design is useless if it cannot get approved on schedule. Your builder needs to understand DWTC's submission process, not just produce a render.
Under the handbook, you or your contractor must upload the required design drawings through Organiser+. DWTC's structural engineer reviews the submission, and a qualified engineer must supervise construction.
DWTC can restrict construction when it considers a stand unsafe. Changes made after a Permit to Build has been issued count as a new request, and the applicable fees are not refundable.
Get the submission deadlines from the organizer first. Then work backward from November 23, 2026.
Ask every builder on your shortlist:
- Have you had exhibition stand designs approved at DWTC before?
- Who prepares and submits the drawings through Organiser+?
- Who is the supervising engineer?
- When do you freeze the design?
- How do you respond to DWTC comments or requested changes?
- Which elements are prefabricated off site?
- Who handles rigging, power, installation, and dismantling?
The answers tell you more than a portfolio. You want a builder that can manage the approval process without leaving critical decisions until the last week.
Do this: Ask every shortlisted builder the same questions and compare their written answers before appointing one.
Also Read: CES 2027 Booth Design Guide.
7. Decide What the Stand Must Do Across the Four Days
Design the stand around measurable work on the show floor. Decide how many meetings you want, how often you will run demonstrations, and how leads will be captured.
According to the official Big 5 Global website, the show runs from 11 am to 6 pm on November 23, 10 am to 6 pm on November 24 and 25, and 10 am to 5 pm on November 26.
That gives your team roughly 30 open hours across 4 days. Visitors also have a full event program competing for their time.
The 2025 program delivered 165 hours of content. Your stand therefore needs a clear reason for visitors to stop rather than relying on general foot traffic.
Plan the Stand Around Your Team
- Meeting capacity: Decide how many serious conversations you need to handle during the busiest hour.
- Staffing: Assign people to reception, product demonstrations, meetings, and lead capture.
- Lead capture: Decide where leads are recorded and who owns the follow up after the show.
A senior audience needs a different floor plan from a stand designed mainly for product sampling. Build around the conversations you actually need to have.
Do this: Set targets for meetings, demonstrations, and qualified leads per day before approving the stand design.
Quick Comparison: The Seven Decisions at a Glance
How We Put This List Together
This guide is based on published research rather than a hands on test. We reviewed the organizer's 2025 post event report, Big 5 Global and DWTC event information, and DWTC's Health & Safety Rules & Regulations Handbook.
We selected the 7 decisions that affect what you can build, how the stand gets approved, or how the space works for the show's audience.
What You Should Know About the Sources
- Rules edition: The build rules cited here come from the June 2024 edition of the DWTC handbook, which states that its requirements are regularly updated. Big 5 Global's exhibitor manual is behind a login, so we could not independently check it against the current manual.
- DWTC handbook: The handbook link used in this guide is a copy hosted on an exhibitor website because we could not locate a current DWTC hosted copy of the same document.
- Attendance figures: The Big 5 Global homepage currently quotes 65K+ global attendees and 1.8K+ global exhibitors, while the 2025 post event report records 85,093 attendees and 2,866 exhibitors. This guide uses the detailed 2025 report and identifies those figures as 2025 data.
- Stand packages: We found no public pricing or package information for Big 5 Global's current stand packages. We have therefore not included package prices.
- Videos: The videos referenced in the original research provide general trade show advice. They are not Big 5 Global or DWTC specific guidance.
We design and build exhibition stands, so we have a commercial interest in exhibitors working with a stand builder. The factual guidance in this article is based on the sources identified above.
Frequently Asked Questions
When and where is Big 5 Global 2026?
Big 5 Global 2026 runs from November 23 to 26, 2026, at Dubai World Trade Centre. Show hours are 11 am to 6 pm on November 23, 10 am to 6 pm on November 24 and 25, and 10 am to 5 pm on November 26.
Do I need a Permit to Build for my stand?
Yes. DWTC's handbook requires a Permit to Build before stand construction starts. The submitted design must meet the venue's health and safety requirements before construction can proceed.
Can I build a double deck stand?
DWTC permits double deck stands subject to approval and structural requirements. Your design needs the required structural drawings, calculations, safety measures, and occupancy signage. Double deck stands are not permitted in the concourses. Confirm that your specific plot allows a double deck structure before designing one.
Where do I find the final rules for my stand?
Start with the exhibitor manual and floor plan supplied by dmg events. Then check the latest DWTC health and safety requirements. The technical figures in this guide come from the June 2024 handbook, so confirm them against the current documents before construction.
Your Next Step
Settle the 7 decisions in order: audience, stand type, position, size, design limits, builder, and purpose.
Do not leave approvals until the end. Get the current exhibitor rules and submission deadlines first, then work backward from November 23, 2026.
If you want a second opinion on your stand concept or show plan, talk to an exhibition strategist at 10x10 Booths. You can also see the other shows we cover in our exhibition calendar.
About this guide: Written by our exhibition stand design team using the organizer's 2025 post-event report and DWTC's published requirements. We design and build custom and modular stands for exhibitions across the US, Europe, the Middle East, and Asia. Our Dubai office is based in Jumeirah Lakes Towers, and our team has more than 10 years of exhibition experience across 200+ shows. Learn more about us or browse our trade show guides.
Related reading: Top 11 Best Upcoming Exhibitions in Dubai, 2026 to 2027

Ready to Build an Exhibition That Performs?
Whether it's a fully custom build, or a multi show programme, we're here to help you plan it. Let's start the conversation.
Whether it's a fully custom build, a pop-up system, or a multi-show programme, we're here to help you plan it. Let's start the conversation.